Press Releases 2024

November 20th, 2024

NOVACIUM’S METAGENE™ ON-DEMAND, AUTONOMOUS, HYDROLYSIS-BASED AND PRESSURIZED HYDROGEN PRODUCTION SYSTEM REACHES MAJOR MILESTONE

English Version
French Version


November 12th, 2024

HPQ SILICA POLVERE FUMED SILICA REACTOR PROJECT UPDATE

English Version
French Version


November 07th, 2024

HPQ ANNOUNCES APPOINTMENT OF NEW AUDITORS

English Version


October 31st, 2024

500 CYCLES MAJOR MILESTONE: NOVACIUM’S SILICON-BASED ANODE BATTERIES DEMONSTRATE HIGH CAPACITY AND HIGH DURABILITY

English Version
French Version


October 22nd, 2024

HPQ FILES PROVISIONAL PATENT APPLICATION FOR HIGH THROUGHPUT SILICON-BASED ANODE MATERIAL MANUFACTURING

English Version
French Version


October 08th, 2024

SILICON-BASED ANODE BATTERIES ACHIEVE 3,606 MAH WITH 93% CAPACITY RETENTION AFTER 300 CYCLES

English Version
French Version


Sept 27th, 2024

HPQ SILICA POLVERE FUMED SILICA REACTOR: COMMISSIONING COMPLETED

English Version
French Version


Sept 18th, 2024

SILICON-BASED ANODE BATTERIES ACHIEVE 3,734 MAH WITH 96% CAPACITY RETENTION AFTER 200 CYCLES, SURPASSING COMMERCIAL ALTERNATIVES BY 66%

English Version
French Version


Sept 11th, 2024

SILICON-ANODE BATTERIES OUTPERFORM GRAPHITE BY 39% WITH 98% CAPACITY RETENTION, AFTER 150 CYCLES

English Version
French Version


Sept 03rd, 2024

GEN3 SILICON-ANODE BATTERIES CONTINUE TO OUTPERFORM GRAPHITE BY 40% WITH MINIMAL DEGRADATION AFTER 100 CYCLES

English Version
French Version


August 21st, 2024

GEN3 SILICON-ANODE LITHIUM-ION BATTERIES OUTPERFORM GRAPHITE BY 40% WITHOUT DEGRADATION AFTER 50 CYCLES

English Version
French Version


August 15th, 2024

NEW DATA FROM FUMED SILICA REACTOR COMMISSIONING SHOWS ADDITIONAL SIGNIFICANT DROP IN BOTH ENERGY USE AND CARBON FOOTPRINT

English Version
French Version


July 30th, 2024

NOVACIUM’S SILICON-BASED BATTERIES WITH GEN3 ANODE MATERIAL SURPASS 4,000 MAH

English Version
French Version


July 23nd, 2024

HPQ SILICA POLVERE FUMED SILICA REACTOR: COMMISSIONING STARTS

English Version
French Version


July 18th, 2024

HPQ SILICON AFFILIATE — NOVACIUM’S GEN2 ADVANCED SILICON-BASED ANODE MATERIAL CONTINUES OUTPERFORMING AT 150 CYCLES

English Version
French Version


July 09th, 2024

HPQ SILICA POLVERE SIGNS LETTER OF INTENT WITH EVONIK CORPORATION

English Version
French Version


June 26th, 2024

HPQ SILICON AFFILIATE — NOVACIUM’S GEN2 ADVANCED SILICON-BASED ANODE MATERIAL DELIVERS SUPERIOR PERFORMANCE AT 100 CYCLES

English Version
French Version


June 21st, 2024

HPQ SILICON AFFILIATE NOVACIUM ENHANCES TESTING CAPABILITIES BY ACQUIRING ADVANCED BATTERY TESTING EQUIPMENT

English Version
French Version


June 18th, 2024

HPQ SILICON WELCOMES CANADA’S RECOGNITION OF SILICON METAL AS A CRITICAL MINERAL

English Version
French Version


June 12th, 2024

HPQ SILICON AFFILIATE — NOVACIUM’S GEN2 ADVANCED SILICON-BASED ANODE MATERIAL DELIVERS SUPERIOR PERFORMANCE AT 50 CYCLES

English Version
French Version


June 05th, 2024

PRE-COMMISSIONING OF FUMED SILICA REACTOR PILOT PLANT UNDERWAY

English Version
French Version


May 30th, 2024

PYROGENESIS TO EXERCISE OPTIONS FOR 50% STAKE IN HPQ SILICA POLVERE INC.

English Version
French Version


May 16th, 2024

HPQ SILICON AFFILIATE NOVACIUM ANNOUNCES ITS GEN 2 ADVANCED SILICON-BASED ANODE MATERIAL DELIVERS SUPERIOR PERFORMANCE

English Version
French Version


May 08th, 2024

HPQ SILICON SIGNS MOU WITH IMPACT FUNDING EUROPE FOR COLLABORATION ON EU FUNDING PROGRAMS

English Version
French Version


April 18th, 2024

FIRST GENERATION OF ADVANCED SILICON-BASED ANODE MATERIAL CONTINUES DELIVERING STRONG PERFORMANCE

English Version
French Version


April 11th, 2024

HPQ FUMED SILICA REACTOR PILOT PLANT DESIGN REWORKED TO FAST TRACK AND DE-RISK COMMERCIAL PLANT SCALE-UP

English Version
French Version


March 21st, 2024

ADVANCED ANODE SILICON-BASED MATERIAL CONTINUES TO DELIVER STRONG PERFORMANCE AT 100 CYCLES

English Version
French Version


March 14th, 2024

18650-TYPE BATTERIES MADE WITH ADVANCED SILICON-BASED MATERIAL CONTINUE TO DELIVER STRONG PERFORMANCE AT 50 CYCLES

English Version
French Version


March 12th, 2024

ALL MAJOR EQUIPMENT RECEIVED FOR HPQ FUMED SILICA REACTOR PILOT PLANT
– FINAL ASSEMBLY ON TRACK FOR Q2 2024 COMMISSIONING

English Version
French Version


February 28th, 2024

18650 TYPE BATTERIES PRODUCED WITH FIRST GEN ENGINEERED SIOX MATERIAL DELIVER STRONG PERFORMANCE AT 25 CYCLES

English Version
French Version


February 15th, 2024

COMMERCIAL LI-ION BATTERIES MADE WITH NOVACIUM’S FIRST GEN ENGINEERED SIOX MATERIAL

English Version
French Version (coming soon)


February 06th, 2024

FINAL ASSEMBLY OF HPQ FUMED SILICA REACTOR PILOT PLANT STARTED; COMMISSIONING SCHEDULED FOR Q2 2024

English Version
French Version


January 31st, 2024

HPQ SIGNS NDA WITH INDUSTRIAL GROUP TO EXPLORE FUMED SILICA PLANT JOINT VENTURE

English Version
French Version


January 24th, 2024

NEW MULTILATERAL AGREEMENT TO EXPLORE THE POSSIBILITY OF INTEGRATING NOVACIUM’S HYDROGEN MANUFACTURING TECHNOLOGY IN FRENCH DEFENCE INDUSTRY

English Version
French Version


January 10th, 2024

INTERNAL TECHNICAL AND ECONOMIC STUDY INDICATES HPQ FUMED SILICA REACTOR’S ROBUST POTENTIAL AT COMMERCIAL SCALE

English Version
French Version







    close-link







      close-link







        close-link